News
News
A new step for High-Luminosity LHC
During a public visit, the HL-LHC collaborators saw the progress on the civil engineering works, where in that moment the excavations had reached 30 metres at Point 1 and 25 metres at Point 5, Accelerating News | Issue #27.
QUACO Phase-3 starts now
Mockups from Sigmaphi, Elytt and Antec. (Image: QUACO). Full details in Accelerating News | Issue #27
Load test in SX1
A 'loaded' start to the year for HiLumi. Before the JTT extraction next week in the ATLAS cavern, a WP8 team performs load tests (18.4 tons) in the SX1.
QUACO cited by the European Commission as a successful Horizon 2020 project
Unique magnets to supercharge the world's largest particle accelerator, European Commission website.
A brand-new beam screen to cope with high luminosity
The beam screen for the High-Luminosity LHC will be installed by 2024 in the aperture of the inner triplet superconducting magnets near ATLAS and CMS, CERN Updates.
Opening the HRMT-45 module by means of a robot
After having undergone several high intensity beam impacts at the HiRadMat facility in August, the TDIS HRMT-45 module was disassembled in November by the EN/STI-TCD and EN/SMM-MRO teams in the bunker 867-R-P58 for the post-irradiation analysis.
High-Luminosity LHC: we’re halfway there
The HL-LHC annual meeting, held on 15 October, had a particular significance this year: we’re halfway between the beginning of the project in 2010 and the scheduled start-up of the machine for physics in 2026...,
Halfway to high luminosity
The High-Luminosity LHC has reached its halfway point. The second-generation LHC project was launched eight years ago and is scheduled to start up in 2026, eight years from now. CERN Updates
Power tests of HL-LHC quadrupole
In July, the fourth short model of the Nb3Sn quadrupole for the HL-LHC interaction regions was tested in SM18, Accelerating News #26.